
 |
 |

OWNER: Alberta Infrastructure and Transportation
DATA: Removal, rehabilitation and installation of three 30 foot wide radial gates and three 16 foot wide roller gates as well as the repainting of new bulkheads and walkways.
All gates were installed with new hoists and lift systems.
COMMENTS: Concrete structure is used to control flow down the Bow River and to divert water into an Western Irrigation District canal System.
|
 |
|
 |
|
 |